Zum Inhalt springen Black Week−15 % auf viele Heizkörper ⏱ bis 27.11.
AKKAYABauelemente GmbH
Cart 0

Our range

Questions? We are here.

+49 172 6343979

Mon–Fri 8:30–17:30 · Sat 10–14 · Warehouse Im Mühlenwert 22, Hagen

DirectionsContact
DeutschEnglishTürkçe
My Account
Log in Register
AKKAYABauelemente GmbH
Deutsch
English
Türkçe
Account Cart 0
  • Radiators
    • Valve radiators
    • Towel radiators
    • Electric towel radiators
    • Wohnraumheizkörper
    • Designheizkörper
    • Plan radiator top covers
    • Underfloor heating
    • Radiator accessories
  • Heating technology
    • Pumps
    • Expansion vessels
    • Heating valves & fittings
  • Showers & Glass
    • Shower enclosures
      • Corner shower enclosures
      • Nischentüren
      • Fünfeck-Duschkabinen
      • U-Duschkabinen
      • Viertelkreis-Duschkabinen
      • Mit Schiebetür
      • Mit Pendeltür
      • Mit Drehtür
      • Mit Eckeinstieg
      • Schwarz
      • Satiniertes Glas (Milchglas)
    • Walk-in shower screens
      • Walk-in shower screens
      • Bath screens
      • Walk-in 10 mm Glas
      • Badewannenaufsatz faltbar
    • Shower niche doors
    • Duschwannen & Duschtassen
      • Shower trays
      • Shower tray & shower head accessories
    • Duschrinnen
    • Duschen-Zubehör
      • Shower channel accessories
      • Shower tray & shower head accessories
  • Plumbing & Installation
    • Toilets
    • Washbasins
    • Taps
    • Connection valves
      • Eckventile & Anschlussarmaturen
      • Wasserzähler & Montageblöcke
      • Auslaufventile & Flexschläuche
      • Unterputz-Armaturen
    • Ball valves
    • Bathroom & Plumbing Accessories
      • Washbasin accessories
    • Consumables
  • Security Systems
    • Surveillance Cameras
    • Video Intercom Systems
    • Alarm Systems
    • Video Recorders
    • Security System Accessories
  • Pipes & Fittings
    • Aluminium multilayer composite pipes
    • Press fittings
    • Brass threaded fittings
    • Push-fit fittings
  • Tools
  • Flooring
    • Click vinyl flooring
    • Glue-down vinyl flooring
  • Contact
  • Directions

Search our store

AKKAYABauelemente GmbH
Account Cart 0
Popular Searches:
Ratgeber

Radiator Removal: Connections and Preparation

By Ilhami Akkaya · AKKAYA Bauelemente GmbH, Hagen · Updated 18 November 2026
Heizkörper abbauen: Anschlüsse und Vorbereitung

Quick answer: Before removal, a water-based radiator must be cool, safely isolated on both flow and return, depressurised and drained in a controlled manner. Water must be collected. Never work on pressurised connections. A heating professional must determine from the existing valves whether the radiator alone can be isolated or a larger section needs draining. If there is any uncertainty, leave removal to that professional.

What you can prepare

This guide helps you prepare for replacement or renovation. It does not give a sequence for undoing unions on an unidentified installation. Photograph the complete radiator, both connection areas and any identification plates. Leave covers and valves fitted while doing so. Note whether the radiator will be refitted later or removed permanently.

For a replacement, also have its height, width and existing connection measurements ready. The existing guide Measuring a radiator for replacement explains how to record them. Preparation stops before opening a water-carrying connection or operating an unidentified valve.

Bottom connections: have the fitting identified

An H-block or radiator connection fitting can combine several functions. Oventrop describes its Multiblock T as combining a thermostatic valve with an isolating fitting, with separate instructions for isolation and draining. This illustrates why “two pipes at the bottom” is not a sufficient working procedure. The functions must be identified on the fitting actually installed.

Ask the heating professional to identify the manufacturer, model and connection layout. Specifically clarify which isolation points serve the flow and return, and how open connections will be secured after removal. Instructions for a different H-block must not be applied without checking. This guide therefore does not prescribe universal turning directions, tool sizes or settings.

Isolation, depressurisation and collecting water

Isolation and draining are separate steps. Even for replacing an air vent, Schauerte specifies a depressurised radiator and a collection container with a cloth ready. Complete radiator removal also requires the professional to account for draining and residual water. A closed thermostat alone is not evidence that a connection can be safely opened.

Agree before the appointment how the floor and nearby furnishings will be protected and where water will be collected. The professional establishes safe shutdown using the installation's documentation. Do not loosen a union nut or plug as a “test”. If water leaks or isolation is uncertain, stop and contact a heating professional.

Blanking plugs: connection and sealing must match

For Multiblock T, Oventrop warns against using the plastic construction cap as isolation against atmospheric pressure with the radiator removed. Its instructions specify a metal closure plug or mounting bridge for that connection. This is not a universal parts list for other valves. It illustrates why the intended closure must be identified before removal.

Have the correct thread, sealing method and permitted closure established for your fitting. Do not choose a blanking plug solely from the pipe's apparent diameter. Also clarify how connections will remain protected during renovation and who will inspect them before reconnection. An arbitrary protective cap does not replace this preparation.

If the radiator will be replaced

AKKAYA carries Type 22 valve radiators and Type 33 valve radiators. Both ranges specify six connections with 1/2-inch female threads: two on the left, two on the right and two at the bottom. This does not promise that existing pipes or a particular H-block will fit without adjustment.

The valve insert is supplied loose rather than pre-installed, according to the stated contents. Blanking and vent plugs supplied with the new radiator are not automatically suitable for securing open connections on the old installation. Have the professional select a replacement using dimensions, the connection drawing and required heat output.

Handing the job over to a heating professional

Provide photographs and a clear task description: temporary removal, replacement or permanent decommissioning. Ask for confirmation of isolation, depressurisation, draining and securing open connections. For refitting, include connection checks and recommissioning in the same assignment. Resolve unanswered questions before the appointment.

For an AKKAYA material enquiry, send the specification established by the professional through Contact. Collection in Hagen by arrangement is available. Work on the water-carrying heating installation and the decision on permanent decommissioning remain the professional's responsibility.

Frequently asked questions

Does it make sense to replace old radiators?

Replacement should address a specific need and suit the heating design. Have condition, connection dimensions and required heat output checked before selecting a new model. Age alone does not justify a blanket promise of savings or the need for replacement.

Can I remove a radiator without draining water?

This guide gives no general approval for doing so. The affected radiator must be safely isolated, depressurised and drained in a controlled manner, with residual water collected. A heating professional determines which section of the installation is involved.

Is turning down the thermostat enough?

Do not rely on that as proof of safe removal. Flow and return isolation, depressurisation and closure of open connections must be established. Never open a pressurised union.

Which blanking plug do I need after removal?

That depends on the connection fitting, its thread and sealing method. Have the closure specified before removal. Plastic protective caps or supplied radiator plugs must not be assumed suitable for securing the pipe connections without checking.

Sources and technical basis

Accessed on 18 November 2026: Oventrop Multiblock T: professional installation instructions, German pages 1–5; Schauerte S-Vent: depressurising a radiator and collecting water; AKKAYA product details for the linked Type 22 and 33 ranges. The Oventrop instructions do not confirm compatibility with these radiators.

About the author

Ilhami Akkaya writes the guides for AKKAYA Bauelemente GmbH in Hagen, Germany. The range focuses on plumbing, heating and bathrooms.

Tags: Heizkörper, Ratgeber
Previous
Cleaning a Shower Enclosure and Removing Limescale
Next
Choosing Pipe for Underfloor Heating

Related Articles

Alte Heizkörper entsorgen: Annahme in Hagen klären

Disposing of Old Radiators: Check Acceptance in Hagen

Duschwanne: Acryl oder SMC in Steinoptik?

Shower Tray: Acrylic or Stone-Look SMC?

Heizkörper reinigen: Lamellen und Abdeckung

Cleaning Radiators: Convector Fins and Covers

Noppensystem verlegen: Fußbodenheizung vorbereiten

Castellated Underfloor Heating: Prepare Installation

Akkaya Bauelemente

Heizkörper, Plan-Abdeckplatten und Zubehör auf Anfrage: Wir antworten mit Preis und Termin. Persönliche Beratung, Abholung in Hagen, Versandkosten unter Versand und Zahlung.

+49 172 6343979 info@akkaya-bauelemente.de

Öffnungszeiten
Mo–Fr 8:30–17:30
Sa 10–14

Warehouse · CollectionIm Mühlenwert 22, 58135 Hagen Shop · AdviceEilper Straße 29, 58091 Hagen Directions and opening hours
AKKAYA auf Facebook AKKAYA auf Instagram AKKAYA auf TikTok AKKAYA auf Kleinanzeigen

Sortiment

  • Heating
  • Radiators
  • Plan radiator top covers
  • Showers & Glass
  • Duschkabinen
  • Duschwände
  • Nischentüren
  • Plumbing & Installation
  • Pipes & Fittings
  • Tools
  • Flooring
  • Security Systems

Heizkörper in Ihrer Nähe

  • Hagen
  • Witten
  • Gevelsberg
  • Herdecke
  • Wetter (Ruhr)
  • Ennepetal
  • Schwelm
  • Schwerte
  • Sprockhövel
  • Wuppertal
  • Breckerfeld
  • Remscheid
  • Iserlohn
  • Hattingen
  • Dortmund
  • Bochum
  • Unna
  • Herne
  • Radevormwald
  • Wermelskirchen
  • Holzwickede
  • Kamen
  • Essen
  • Gelsenkirchen
  • Solingen
  • Lüdenscheid
  • Düsseldorf
  • Leverkusen
  • Duschkabine Dortmund
  • Duschkabine Bochum
  • Duschkabine Wuppertal
  • Duschkabine Witten
  • Duschkabine Herdecke
  • Duschkabine Gevelsberg
  • Duschkabine Ennepetal
  • Duschkabine Schwelm
  • Duschkabine Iserlohn
  • Duschkabine Lüdenscheid
  • Duschkabine Hattingen
  • Duschkabine Wetter
  • Duschkabine Herne
  • Duschkabine Essen
  • Heizung in Hagen
  • Heizung kaufen
  • Fußbodenheizung Hagen
  • Fußbodenheizung kaufen
  • Heizkreisverteiler Hagen
  • Heizkreisverteiler kaufen
  • Fittings Hagen
  • Pressfitting kaufen
  • Vinylboden Hagen
  • Sanitärhandel Hagen
  • Badheizkörper Hagen
  • Badheizkörper Dortmund

Kundenservice

  • Collection & Enquiry
  • Buy as a private customer
  • Contact
  • Search

Informationen

  • Guides
  • Legal notice
  • Privacy policy
  • Right of withdrawal
  • Terms and conditions
  • Directions
  • Withdraw from contract
© 2026 AKKAYA Bauelemente GmbH. Alle Artikel auf Anfrage. Abholung in Hagen. Your legal guarantee rights
Home
Categories
0 Cart
Directions

Cart

Your cart is currently empty. Legen Sie Produkte hinein. Sie erhalten Abholpreis und Termin per Antwort. Heizkörper ansehen
null
Zur Anfrage

Our locations in Hagen

Warehouse · Collection

AKKAYA Bauelemente GmbH
Im Mühlenwert 22
58135 Hagen (rear entrance)

Mon–Fri 8:30–17:30 · Sat 10–14
Collection by appointment – the date comes with our reply.

RouteCall

Shop · Advice on site

AKKAYA Bauelemente GmbH
Eilper Straße 29
58091 Hagen

Advice, small parts and accessories.
By appointment, please call ahead: +49 172 6343979.

RouteEmail

All details about our locations

Your legal guarantee rights

EU notice: Legal guarantee. At least two years of legal guarantee of conformity for goods sold in the European Union.

More about your rights (europa.eu) Open in full size