In a castellated underfloor heating system, the studs on the system board hold the heating pipe. AKKAYA supplies the EPS 150 (DEO) castellated system board. This guide helps you prepare installation and agree the sequence with your heating professional. The actual installation follows the instructions for the selected board and the planned floor build-up.
Which castellated board do we offer?
The published product description states a board height of 29 mm including the studs, net dimensions of 907 × 1472 mm and item number HT-122985. These 29 mm describe the board, not the total floor build-up. Screed, floor covering and any additional insulation must be planned separately.
According to the description, the pipe is pressed between the studs; tacker staples are not required. The product information we reviewed does not specify which pipe dimensions are approved for this particular board. Have the combination confirmed before ordering. A matching outside diameter alone does not establish system approval.
Installing a castellated system: before the screed
1. Clarify the substrate and layers
Have the substrate, available height, insulation and screed requirements checked. Obtain the board's installation instructions. Without them, do not assume a particular membrane overlap, board joint or suitability for a specific screed.
2. Prepare edges and boards
Agree the perimeter insulation, doorways and connections with the professional. Use the instructions to establish how boards are cut and joints completed. Pipe penetrations and movement joints require details that match the design.
3. Follow the pipe layout
Pipe routing follows the planned heating circuits. Press only an approved pipe between the studs, as instructed by the manufacturer. Do not estimate pipe spacing or bending radius from the stud pattern. Discuss damaged boards or kinked pipes with the professional before they are covered.
4. Arrange checks and keep records
Agree the required checks and permission to cover the system with your professional before the screed is installed. Keep records of the pipe routes and testing. This guide does not prescribe a test pressure, test duration or screed cover for your system.
How this differs from tacker systems and pipe design
A tacker system secures the pipe with staples. Castellated boards use a different fixing method. A blanket claim that either method is better is unhelpful without knowing the proposed build-up.
Design is covered in pipe layouts and heating circuits. For pipe selection, see choosing underfloor heating pipe. This guide focuses on preparation and the installation sequence for castellated boards.
Frequently asked questions
How thick must the insulation beneath underfloor heating be?
That depends on the planned build-up and requires calculation. The offered board is 29 mm high including its studs; this does not establish a universally suitable insulation thickness for your building.
Do I need tacker staples for this castellated board?
Not according to the product description: the approved heating pipe is pressed between the studs. Tacker accessories belong to the other fixing method.
Does every heating pipe fit the board?
No such approval has been established. Request the permitted pipe dimensions and instructions for item HT-122985 before combining the board with a pipe.